On-site waste audits and waste reduction work plans that satisfy Ontario Regulation 102/94, done by weight and by stream, followed by a diversion program that turns the recoverable streams into rebates and a landfill number that keeps falling. Automotive, pharmaceutical and manufacturing facilities across the GTA and Ontario.
Automotive Manufacturers
Pharmaceutical Companies
Manufacturing Facilities
A waste audit is a measured account of what a facility throws away: how much, of what, from where, and what happens to it now. It is the starting point for any diversion target that is going to be more than a slogan, and for larger Ontario operations it is a legal requirement. Ours is done on site, by weight and by stream, and it ends in two documents: a waste audit report and a waste reduction work plan you can act on and, if you are a designated facility, keep on file for the regulator. The first on-site visit is free and shows where the savings are; the written report and work plan that O. Reg. 102/94 requires come with our full waste audit.
Ontario Regulation 102/94 under the Environmental Protection Act requires designated establishments to conduct a waste audit, prepare and implement a waste reduction work plan, and update both at least once a year. For manufacturers the trigger is size: a large manufacturing establishment is one where the people employed at the site worked more than 16,000 hours in any single month during the preceding two calendar years, roughly 100 full-time staff. The other designated classes:
| Designated establishment | Threshold |
|---|---|
| Large manufacturing establishments | More than 16,000 employee hours in any month over the preceding two years |
| Retail shopping establishments and complexes | More than 10,000 square metres of floor area |
| Office buildings | More than 10,000 square metres of floor area |
| Restaurants | More than $3 million in gross annual sales across the owner's Ontario restaurants |
| Hotels and motels | More than 75 units |
| Hospitals | Class A, B or F under the Public Hospitals Act |
| Educational institutions | More than 350 persons enrolled at the location |
| Construction and demolition projects | Buildings of 2,000 square metres or more |
Three things about the paperwork catch people out. The audit report and the work plan must be kept on file for at least five years. The work plan, or a summary of it, must be posted where employees can see it. And nothing is filed automatically: the ministry does not collect audits, but the owner or operator must produce the most recent audit and work plan within seven days if the Director asks for them. Construction and demolition projects have their own version of the requirement, covered on our construction waste recycling page.
The regulation sets the minimum. The audit has to address the amount, nature and composition of the waste; how it is produced, including the management decisions and practices behind it; how it is currently managed; and the extent to which the materials or products the facility uses or sells contain recycled or reused content. Our report covers each of those and adds what you need to run a program from it:
The work plan is the audit turned into commitments: a plan to reduce, reuse and recycle each stream, who is responsible for each action, when it will be implemented, and the results expected. Ours is written so it can be posted and handed to an auditor as is, and so that the recycling program that follows it, containers at the line, pickups matched to production and reporting on every load, generates the evidence for next year's update without anyone rebuilding a spreadsheet.
Zero waste to landfill on plastics is achievable for most manufacturers, because post-industrial scrap is clean and consistent. Across the whole site it is a longer road, and it is walked one stream at a time: the audit shows which streams are large, which have a recovery route, and which are still going to landfill by habit. Purge from colour changes, damaged totes and crates, caps separated at a filling line, off-spec runs in quarantine and stretch wrap off the receiving dock are where the unclaimed tonnage usually sits. A plan that names those streams, assigns them a container and a route, and measures them is how the landfill line reaches zero.
We audit plants and facilities across the Greater Toronto Area, including Toronto, Mississauga and Hamilton, and across Ontario, from our Ajax facility. Multi-site manufacturers get the same audit method and report format at every plant, so the corporate diversion figure adds up. Waste audits pair with our industrial recycling program, and for the regulatory detail behind it, read Understanding Ontario's waste audit requirements.
Tell us about your facility and its waste streams, and we reply within 24 hours to book a time. The first on-site visit is free; the written report and work plan come with the full waste audit.

Complete Landfill Diversion
Achieve measurable sustainability targets.

Reduced Waste Management Costs
Maximize efficiency and reduce operational expenses.

Customized Strategies
Solutions specifically tailored to your business operations.

Regulatory Compliance
Stay ahead of changing waste regulations.
Why Choose Target Recycling?
Since 1998 we have honed our recycling solutions to meet the unique needs of various industries. Our commitment to excellence ensures that you receive the highest quality service tailored to your requirements.
Trusted expertise in recycling solutions since 1998.
ISO 14001 certified for compliance and environmental responsibility.
Transparent processes with competitive pricing for every project.





























Your Easy 3-Step Path to Sustainability
Book Your On-site Visit
We'll identify your recycling and compliance needs with zero obligation.
Receive Your Custom Recycling Plan
Tailored solutions built specifically to match your operational requirements.
Meet Compliance & Sustainability Goals
Implement your recycling strategy, reduce waste management costs, and achieve regulatory compliance.
Establishments designated under Ontario Regulation 102/94. For manufacturers, that is any site where employees worked more than 16,000 hours in a single month during the preceding two years, roughly 100 full-time staff. Large retail complexes, office buildings, hotels, hospitals, schools, restaurant groups and construction projects of 2,000 square metres or more are designated too. Smaller facilities are not required to audit but usually find the same savings.
At least once a year for designated establishments, along with the waste reduction work plan. We also recommend a refresh after any significant change in production, packaging or site layout, because that is when the streams change.
The on-site work is typically completed within one to two days, depending on facility size and how many streams need sorting, and the written report and work plan follow.
No. O. Reg. 102/94 does not require automatic reporting. You keep the audit report and the work plan on file for at least five years, post the work plan or a summary where employees can see it, and produce the most recent versions within seven days if the Director asks for them.
The document that follows the audit: a plan to reduce, reuse and recycle each waste stream, with who is responsible for each action, when it will be implemented and the results expected. Designated establishments must prepare one, implement it, update it annually and keep it on file. We write it so it doubles as the operating plan for your recycling program.
The first on-site visit is free with no obligation, and it shows where the savings are: clean plastic scrap that was paying a tipping fee moves to a rebate, hauling volume drops, and the diversion rate you report goes up. For one plastic moulder, that meant going from $18,200 a year in hauling and landfill fees to $22,400 a year in rebates. The written O. Reg. 102/94 waste audit report and waste reduction work plan are not part of the free visit; we prepare them as part of our full waste audit.